For your first Smart charging task, do not change many settings: run defaults once, then adjust one item at a time. Smart/load management can avoid panel upgrade but adds device/config cost.
Why it matters
Change one variable at a time so you know which setting matters.
Load management.
Step by step
- Confirm parking/meter/panel capacity and wire run.
- Choose Level 2 charger/amperage and whether a panel upgrade is needed.
- Get electrician quotes: charger, wiring, breaker, permit, labor.
- Check local rebates/rates for total cost of ownership.
Common mistakes
- Looking at charger price only, not wiring/panel.
- Not confirming panel capacity.
- Ignoring permits/inspection.
- Not checking rebates/rates.
Checklist
- Parking/meter/panel location.
- Wire run/gauge/breaker.
- Charger amperage/plug/outdoor rating.
- Permit/inspection/insurance.
- Rebates/rates/warranty.
Who it is for
If this is your first Smart charging, narrow by Load management. and TOU. first, then look at specific models.
Key facts
- Load management.
- TOU.
- Config.
FAQ
How do I start with Smart charging?
For your first Smart charging task, do not change many settings: run defaults once, then adjust one item at a time. Smart/load management can avoid panel upgrade but adds device/config cost.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Autel