Choose Hidden costs by use case and compatibility first, specs second; test locally when possible. Panel/trenching/conduit/permit/inspection/wall repair are easy to miss.
Why it matters
Stacked specs do not guarantee fit for your use case.
Trenching.
Step by step
- Confirm parking/meter/panel capacity and wire run.
- Choose Level 2 charger/amperage and whether a panel upgrade is needed.
- Get electrician quotes: charger, wiring, breaker, permit, labor.
- Check local rebates/rates for total cost of ownership.
Common mistakes
- Looking at charger price only, not wiring/panel.
- Not confirming panel capacity.
- Ignoring permits/inspection.
- Not checking rebates/rates.
Checklist
- Parking/meter/panel location.
- Wire run/gauge/breaker.
- Charger amperage/plug/outdoor rating.
- Permit/inspection/insurance.
- Rebates/rates/warranty.
Who it is for
If this is your first Hidden costs, narrow by Trenching. and Conduit. first, then look at specific models.
Key facts
- Trenching.
- Conduit.
- Repair.
FAQ
How do I choose Hidden costs?
Choose Hidden costs by use case and compatibility first, specs second; test locally when possible. Panel/trenching/conduit/permit/inspection/wall repair are easy to miss.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Sunrun