Home/Answers/Hidden costs
EV CHARGER COST LAB / Hidden costs

Common Hidden costs Mistakes

The most common Hidden costs mistakes are overwriting originals, ignoring format/quality and not checking the output.

Updated 2026-11-03About 3 minLocal test
Quick answer

The most common Hidden costs mistakes are overwriting originals, ignoring format/quality and not checking the output. Panel/trenching/conduit/permit/inspection/wall repair are easy to miss.

Why it matters

These mistakes cause irreversible data or quality loss.

Trenching.

Step by step

  1. Confirm parking/meter/panel capacity and wire run.
  2. Choose Level 2 charger/amperage and whether a panel upgrade is needed.
  3. Get electrician quotes: charger, wiring, breaker, permit, labor.
  4. Check local rebates/rates for total cost of ownership.

Common mistakes

  • Looking at charger price only, not wiring/panel.
  • Not confirming panel capacity.
  • Ignoring permits/inspection.
  • Not checking rebates/rates.

Checklist

  • Parking/meter/panel location.
  • Wire run/gauge/breaker.
  • Charger amperage/plug/outdoor rating.
  • Permit/inspection/insurance.
  • Rebates/rates/warranty.

Who it is for

If this is your first Hidden costs, narrow by Trenching. and Conduit. first, then look at specific models.

Key facts

  • Trenching.
  • Conduit.
  • Repair.

FAQ

What are common Hidden costs mistakes?

The most common Hidden costs mistakes are overwriting originals, ignoring format/quality and not checking the output. Panel/trenching/conduit/permit/inspection/wall repair are easy to miss.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Sunrun