Home/Answers/Load calculation
EV CHARGER COST LAB / Load calculation

Load calculation Requirements

Handling Load calculation needs a supported browser/app, enough disk/memory and a valid input file.

Updated 2026-11-03About 3 minLocal test
Quick answer

Handling Load calculation needs a supported browser/app, enough disk/memory and a valid input file. Load calculation decides panel upgrade/load management.

Why it matters

Missing any condition can turn an environment issue into a false file-corruption diagnosis.

Load.

Step by step

  1. Confirm parking/meter/panel capacity and wire run.
  2. Choose Level 2 charger/amperage and whether a panel upgrade is needed.
  3. Get electrician quotes: charger, wiring, breaker, permit, labor.
  4. Check local rebates/rates for total cost of ownership.

Common mistakes

  • Looking at charger price only, not wiring/panel.
  • Not confirming panel capacity.
  • Ignoring permits/inspection.
  • Not checking rebates/rates.

Checklist

  • Parking/meter/panel location.
  • Wire run/gauge/breaker.
  • Charger amperage/plug/outdoor rating.
  • Permit/inspection/insurance.
  • Rebates/rates/warranty.

Who it is for

If this is your first Load calculation, narrow by Load. and Panel. first, then look at specific models.

Key facts

  • Load.
  • Panel.
  • Management.

FAQ

What do I need to handle Load calculation?

Handling Load calculation needs a supported browser/app, enough disk/memory and a valid input file. Load calculation decides panel upgrade/load management.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Sunrun