Local Fleet charging tools are more private and work offline; online tools save installation but files leave your device. Fleet includes multiple vehicles/load management/scheduling/energy, not one charger.
Why it matters
Use local for sensitive files; online is fine for small temporary ones.
Multi-vehicle.
Step by step
- Confirm parking/meter/panel capacity and wire run.
- Choose Level 2 charger/amperage and whether a panel upgrade is needed.
- Get electrician quotes: charger, wiring, breaker, permit, labor.
- Check local rebates/rates for total cost of ownership.
Common mistakes
- Looking at charger price only, not wiring/panel.
- Not confirming panel capacity.
- Ignoring permits/inspection.
- Not checking rebates/rates.
Checklist
- Parking/meter/panel location.
- Wire run/gauge/breaker.
- Charger amperage/plug/outdoor rating.
- Permit/inspection/insurance.
- Rebates/rates/warranty.
Who it is for
If you are deciding between two models, put Multi-vehicle. and Scheduling. in one table and compare on the same basis.
Key facts
- Multi-vehicle.
- Scheduling.
- Load.
FAQ
Local or online tools for Fleet charging?
Local Fleet charging tools are more private and work offline; online tools save installation but files leave your device. Fleet includes multiple vehicles/load management/scheduling/energy, not one charger.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Nayax